Last updated: 21/01/10 |
 |
| |
|
|
| |
2010 Refurbishment of the Frank Lee Centre |
|
| |
|
|
| |
The main project will start on 22nd March and will be finished by the end of 2010. The details are shown below. |
|
| |
|
|
| |
Main Project - Two Phases of work |
|
| |
|
|
| |
Phase 1 (Mar – July 2010) |
|
| |
7pm 21st March Ladies downstairs Changing Room and Squash Courts close.
29th March Men's downstairs changing rooms close.
Please follow signs to temporary changing facilities.
- Complete strip out, extension and refurbishment of the downstairs changing rooms
- Installation of 1st floor (above new changing rooms) to accommodate 2 new classes studios
- Extension of the building (next to the sports hall) on two levels to include a new gym space (ground floor) and new large class studio on 1st Floor
Please note the Squash courts close at the start of Phase 1 and will not re-open until the end of phase 2. We have made alternative arrangements for squash during this time. Please see downloads below or email stuart.hay@frank-lee.com to get more information. |
|
| |
|
|
| |
Phase 2 (July – Dec 2010) |
|
| |
- Gym temporarily moves into the Terrace room (there will be a reduced amount of machines available during this time)
- Terrace room classes all move into new studios above new changing rooms
- Continuation of construction of 2 storey extension
- Installation of new Spinning studio on 1st Floor
- Construction of two new squash courts
|
|
| |
|
|
| |
Questions & Answers |
|
| |
Q. Will the club stay open during the work?
A. Yes, however during the project there will be no squash courts, all other facilities will remain open throughout although there will be a smaller temporary gym available during phase 2.
We have arranged for access to some other squash facilities during the project. Please email Stuart Hay to get more information or ask at the reception desk.
Q. What will we do for changing facilities during the work?
A.For pool users there are temporary changing cubicles, shower facilities, toilets and lockers in the poolside area. For gym and classes users we have made some changes to the upstairs changing rooms to increase capacity. These are sign posted from reception. We have also set aside a room in the reception area with hairdryers and mirrors in.
Q. Can I change my membership if the works affect my usage?
A. Any member who doesn’t want to use any of the facilities during the work will be able to freeze their membership at no charge. Members will also be able to change their membership category in the normal way if their usage pattern is likely to be affected.
Q. How can I change my membership type or freeze my membership?
A. There is a simple form available from reception or downloadable below. You can complete it on your PC and email it to andrew.dunn@frank-lee.com or drop it in at the club.
Q. With all these temporary arrangements, how will we know where to go?
A.In addition to these updates we are also having some specific drawings made up to help members understand the 2 phases and where everything is during each phase. |
|
| |
|
|
| |
Some more details |
|
| |
All the showers will have individual temperature control.
Both changing rooms will have a spin dryer to dry swimming costumes.
The new changing rooms will have new everything (e.g. lockers, benches, showers and changing cubicles).
The new changing rooms won’t have air conditioning but will have a brand new ventilation system which will be much more effective at controlling the temperature and humidity.
The gym equipment will be the same as we currently have but moved into the new room. Replacement gym equipment pushed this project costs up too high. The equipment will be replaced in the future but not as part of this project.
The snooker facility will be lost but may be replaced in the future. |
|
| |
|
|
| |
Your views... |
|
| |
Please fell free to email me your comments and/or suggestions:stuart.hay@frank-lee.com |
|
| |
|
|
| |
Further information:. |
|
| |
|
|
| |
Alternative Squash arrangements (PDF 25k)
2010 Membership amendment form (PDF 59k) |
|
| |
|
|
| |
For detailed drawings of the refurbishment please click below: |
|
| |
|
|
| |
Proposed First Floor plan (PDF 349k)
Proposed Ground Floor Plan 1 (PDF 577k) |
|
| |
|
|